Michael wants to dig a hole 400 feet less deep than twice the depth of the hole that his father dug. The father dug a hole at a rate of 4 feet per hour. If the father took 400 hours to dig his hole, how many hours will it take for Michael to dig a hole that is 400 feet less than twice as deep as his father's hole working at the same rate?