Bill is laying power cable for a new neighborhood. There are going to be 18 east-west streets that are 2 miles long and 10 north-south streets that are four miles long. It takes 5 miles of cable to electrify 1 mile of street. If cable costs $2000/mile, what is the total cost of cable for the neighborhood?